Projects

Selected steam references with practical operating context.

Each project summary highlights challenge, platform choice, and execution logic so buyers can compare similar industrial scenarios.

Challenge Results

Project references structured for technical-commercial benchmarking.

Each project reference follows a clear structure: challenge, selected platform, operating conditions, and execution notes so procurement and engineering teams can compare scenarios faster.

  • Challenge: operational constraints by fuel, duty, emissions, and timeline
  • Solution: platform selection and key engineering measures
  • Results: capacity, operating conditions, and commissioning logic
6 t/h

Dairy processing | Brazil

Challenge: customer-specific standards and high chip moisture in a dairy application. Solution: VMU biomass boiler with pre-air heater and PLC plus supervisory controls. Result: reference package shaped for stable saturated steam generation.

6 t/h

Biomass steam export | Chile

Challenge: export a high-efficiency steam package with wet-chip firing and documentation discipline. Solution: VMIC-RG with high-chromium grate, factory interconnection, and ASME-sealed package. Result: export-ready saturated-steam reference for Chile.

10 t/h

Petrochemicals | Colombia

Challenge: maintain steam continuity in petrochemical duty while meeting international requirements. Solution: FOUR boiler with economizer by-pass and combustion controls aligned to UL and CE criteria. Result: saturated-steam reference built for continuity and compliance.

Reference Filters

Industry Fuel Strategy Steam Capacity Country

Reference Project Visuals

Case-style visuals organized by challenge, execution, commissioning, and measurable outcomes.

Reference project visual - client challenge context
Client challenge context
Reference project visual - execution phase
Execution phase
Reference project visual - commissioning stage
Commissioning stage
Reference project visual - performance outcomes
Performance outcomes